11) The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as

Discuss in Comment

independent float

12) The constraints in the case of resource smoothening operation would be

Discuss in Comment

project duration time

13) Interfering float is the difference between

Discuss in Comment

total float and free float

14) The independent float affects only

Discuss in Comment

the particular activity involved

15) Critical path

Discuss in Comment

is always shortest

16) The time with which direct cost does not reduce with the crease in time is known as

Discuss in Comment

normal time

17) The time corresponding to the minimum total project cost is

Discuss in Comment

between normal time and crash time

18) The direct cost of a project with respect to normal time is

Discuss in Comment

minimum

19) The reduction in project time normally results in

Discuss in Comment

increasing the direct cost and decreasing the indirect cost

20) Economic saving of time results by crashing

Discuss in Comment

cheapest critical activity

Subject Notes

Objective Box

PSC ADVERTISEMENT

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2024 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us