independent float interfering float total float free float
Answer Discuss in Comment
resources project duration time both resources and project duration none of the above
total float and free float total float and independent float free float and independent float none of the above
preceding activities succeeding activities the particular activity involved none of the above
may be longest may be shortest is always longest is always shortest
crash time normal time optimistic time standard time
crash time optimistic time normal time between normal time and crash time
maximum zero infinite minimum
decreasing the direct cost and indirect cost both increasing the direct cost and indirect cost both decreasing the direct cost and increasing indirect cost increasing the direct cost and decreasing the indirect cost
cheapest critical activity costliest critical activity costliest non-critical activity cheapest non-critical activity