41) Expected project duration generally follows

Discuss in Comment

normal distribution curve

42) Which of the following is a weakness of the bar chart?

Discuss in Comment

all of the above

43) During the construction period, price variation clause in contracts caters to

Discuss in Comment

variation in cost in materials element, labour element and petrol-oil- lubricant element

44) At a worksite, statistical quality control of concrete means

Discuss in Comment

applying the theory of probability to sample testing inspection

45) In PERT analysis, the time estimates of I activities and probability of their occurrence follow

Discuss in Comment

β- distribution curve

46) Which of the following is not a PERT event?

Discuss in Comment

Class is being attended

47) The area under the (beta) – distribution curve divided into two equal parts by

Discuss in Comment

Expected time

48) A bar chart is also known as

Discuss in Comment

Gantt chart

49) A bar chart is drawn for

Discuss in Comment

time versus activity

50) Milestones are

Discuss in Comment

the events specifying the beginning and/or the end of subdivided activities

Subject Notes

Objective Box

PSC ADVERTISEMENT

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2024 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us