map study, reconnaissance, preliminary survey and detailed survey map study, preliminary survey, recon- naissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, recon- naissance and detailed survey
Answer Discuss in Comment
equally on inner and outer sides of the curve fully on the outer side of the curve fully on the inner side of the curve one-fourth on inner side and three- fourth on outer side of the curve
0.1% 1% 10% no compensation
ruling gradient exceptional gradient minimum gradient limiting gradient
three times the longitudinal gradient half the longitudinal gradient two times the longitudinal gradient longitudinal gradient
an ascending gradient meets with another ascending gradient an ascending gradient meets with a level surface an ascending gradient meets with a descending gradient a descending gradient meets with another descending gradient
annual average daily traffic annual average hourly volume thirtieth highest hourly volume peak hourly volume of the year
50th percentile 98th percentile 15th percentile 85th percentile
clearance to be provided under structures such as over bridges, under- bridges etc. width of shoulders and parking facilities width of traffic lanes extra width of pavement and minimum turning radius
possible capacity theoretical capacity practical capacity basic capacity
"Scientists dream about doing great things. Engineers do them."