If the probable error in single observation is +0.04 m and that of the mean is +0.01 m, then the number of observations are

"Scientists dream about doing great things. Engineers do them."

PSC Advertisement  | Federal PSC | Bagmati PSC | PSC Karnali | PSC Lumbini | PSC Sudurpaschim | PSC Gandaki | PSC State 1.

Copyright © | 2021 - 2023 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us

Tweet
Share
Share
Pin