Civilboss MCQS (3)

231) The inspection pit or chamber is a manhole provided in a base drainage system

Discuss in Comment

All of the above

232) The bacteria which can serve with or without oxygen is known as

Discuss in Comment

Facultative bacteria

233) Pick up the item which is not included in the plinth area estimated

Discuss in Comment

Courtyard area

234) The main factor to be considered while preparing a detailed estimate is

235) Which of the technique was used firstly for the planning of a project?

Discuss in Comment

Bar chart

236) The main purpose of as built drawing is

Discuss in Comment

Maintenance of service work

237) The purpose of proper and accurate measurement of concrete ingredients for uniformly of properties is knows as

Discuss in Comment

Batching

238) In order to determine the natural features such as valley rivers Lakes etc. the surveying preferred is

Discuss in Comment

Topographical surveying

239) The line joining the points having the same elevation above datum surface is called a

Discuss in Comment

Contour line

240) Greater accuracy in linear measurement is obtained by

Discuss in Comment

Direct taping

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us