Estimating and Costing

31) No deductions is made in the masonry for the openings if the area of the opening does not

Discuss in Comment

0.10 m²

32) The approximate cost of the complete labour as a percentage of the total cost of the building is

33) In the detailed estimate the volumes are worked out to the nearest

Discuss in Comment

0.01 m³

34) The quantity of damp proof course (D.P.C.) is worked out in

Discuss in Comment

m²

35) The thickness of slabs and beams must be measured to the nearest

Discuss in Comment

0.005 m

36) What is the minimum period for which the lime concrete in foundation be left wet without the construction of masonry over it?

Discuss in Comment

7 days

37) The approximate weight of one cubic metre of mild steel is

Discuss in Comment

7850 kg

38) Which of the following is not a common size of reinforcement bars

Discuss in Comment

28 mm

39) In the case of unsewered areas, an additional provision for septic tank is usually

Discuss in Comment

3 to 4% of the building cost

40) The capacity of a flushing cistern is normally

Discuss in Comment

12 to 15 litres

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us