Highway Engineering

111) To fill pot holes of a Bituminous surface

Discuss in Comment

60 mm thick layers of premixed Bituminous concrete is placed in position and rammed

112) For filling the pot hole of an earthen road, the hardness of the filling material

Discuss in Comment

should have the same hardness of neighbouring material

113) AADT is

Discuss in Comment

Total traffic in an year/ 365 (or 366) x 24

114) Permissible tolerance in grade, camber and alignment of a cement concrete road is

Discuss in Comment

0.1%

115) Rapid curing cutback bitumen is produced by blending bitumen with

Discuss in Comment

petrol

116) For carrying out bituminous patch work during the rainy season, the most suitable binder is

Discuss in Comment

bituminous emulsion

117) Which one of the following binders is recommended for a wet and cold climate?

Discuss in Comment

emulsion

118) The general requirement in constructing a reinforced concrete road is to place a single layer of reinforcement

Discuss in Comment

near the top of the slab

119) Which one of the following causes ravelling in bituminous pavement?

Discuss in Comment

low bitumen content

120) The sequence of four stages of survey in a highway alignment is

Discuss in Comment

map study, reconnaissance, preliminary survey and detailed survey

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us