Irrigation Engineering

161) Syphon aqueduct is selected as the cross drainage work when the canal bed level

Discuss in Comment

is below the maximum flood level in the drain

162) In syphon aqueduct the depth of d/ s cut-off below high flood level is taken as

Discuss in Comment

1.5 times the scour depth

163) Dry stone pitching on a sloping face of an earth dam is known as

Discuss in Comment

lining

164) The process of washing out of the salt from the upper zone of the soil by flooding is called

Discuss in Comment

leaching

165) An irrigation canal which is designed to irrigate all round the year may be called

Discuss in Comment

continuous canal

166) Canals which are excavated directly from the rivers with or without head regulator are called

Discuss in Comment

innudation canals

167) The canals meant for the purpose of draining off water from water logged areas are called

Discuss in Comment

drains

168) Dead storage in a reservoir is provided

Discuss in Comment

to mitigate the floods

169) The crest level of a barrage is generally kept

Discuss in Comment

almost at the river bed level

170) The divide wall in a diversion headwork is provided

Discuss in Comment

to prevent the formation of vortices in front of head regulator

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us