Irrigation Engineering

61) Net irrigation requirement of a crop is given as

Discuss in Comment

consumptive use effective rainfall

62) The field irrigation requirement is computed as

Discuss in Comment

net irrigation requirement + field application losses

63) The intensity of irrigation is defined as the ratio of

Discuss in Comment

culturable cultivated area to culturable commanded area

64) Cross drainage works are not required when the canal is completely

Discuss in Comment

a ridge canal

65) in which of the canals may one bank be avoided?

Discuss in Comment

ridge canal

66) Which of the following canal has the command area only on one side?

Discuss in Comment

contour canal

67) The purpose of the cross-regulator is

Discuss in Comment

to maintain proper levels in the main canal

68) When canal runs above the drain, the cross drainage work provided is

Discuss in Comment

aqueduct

69) When the canal runs below the drain, the cross drainage work provided is called

Discuss in Comment

super passage

70) Guide banks are provided

Discuss in Comment

to confine the width of the river

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us