101) which would represent the most likely time estimate.

Discuss in Comment

the time the activity would most often require if normal conditions prevail

102) Pick up the correct statement from the following :

Discuss in Comment

all the above

103) The flow of time in a network is generally

Discuss in Comment

from left to right

104) PERT is an abbreviation for

Discuss in Comment

Programme Evaluation and Review Technique

105) When the events are numbered in a network then the number of the head event of activity is

Discuss in Comment

always larger than the number of the tail event of the same activity

106) which would represent the pessimistic time estimate.

Discuss in Comment

the maximum time required to complete the activity under adverse conditions

107) The direct cost of a project is due to

Discuss in Comment

cost of materials and wages of labour

108) Total cost is

Discuss in Comment

direct cost + indirect cost

109) Outage loss plus overheads is equal to

Discuss in Comment

direct cost

110) PERT adopts

Discuss in Comment

probabilistic approach

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us