221) Necessary elements of the estimate are

Discuss in Comment

All of the above

222) The main purpose of rate analysis is

Discuss in Comment

To find actual cost per unit items

223) The quantities of woodwork in a doorframe having clear opening in the wall is 7ft*4ft and chowkats are 4inch*3inch. The end of horizontal chowkats projects 6 inch horns on each side into the wall is

Discuss in Comment

2 cubic feet

224) The number of bricks required for a wall of 80 feet long 1 feet inch thick and 7 feet high with one mortar joint is (the dimension of brick is 10 inch by 5 inch by 3 inch)

Discuss in Comment

8064

225) The technique of determining the fair price of value of a property is

Discuss in Comment

Valuation

226) The direct cost corresponding to the completion of an critical activity within the given time in order to maintain the critical path not disturbed is

Discuss in Comment

Updated cost

227) In a commercial zone of FAR 3, total no. of floors permissible to the land area of 1000 sq/m and ground coverage of 500 sq/m is

228) Which of the following scale is largest one

Discuss in Comment

1:4200

229) The gazette second class officer level authority can approve the cost estimate upto

Discuss in Comment

10 million

230) Aesthetic parts of the building include

Discuss in Comment

Harmony and rhythm with surrounding

Subject Notes

Objective Box

PSC ADVERTISEMENT

CIVILBOSS is a free education & learning platform, for the global community of civil engineering students and working professionals, where you can practice multiple choice questions & answers (MCQs), Study Notes, tutorials, Civil Engineering PSC Old Question for Various Level, PSC Exam Crack, Short Question & Answer for Related Particular Topic and Many More. It covers your one-stop destination for job exam preparation with daily practice MCQ and notes.

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2026 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us