71) Earthing system resistance, unlsess otherwise stated is

72) In electrical works each switch is normally placed in

Discuss in Comment

single phase

73) The amount of water required to fill up the pore spaces in soil particles by replacing all air held in pure space in known as

Discuss in Comment

saturation capacity

74) If the wearing course of road is 5cm, base course is 15cm, sub base course is 15 cm and capping layer is 15 cm then what will be thickness of payment ?

Discuss in Comment

50cm

75) For transportation purposed in Nepal. the first preference is given to

Discuss in Comment

roadways

76) The maximum super-elevation on hill roads should not exceeds

77) A wall constructed to retain the earth from slippage on the hill side of the roadway is called

Discuss in Comment

breast wall

78) Specification of a construction work clearly defines

Discuss in Comment

all of the above

79) The district rate finalizing committee does not include the representative of

Discuss in Comment

Nepal Engineering's Association, district unit

80) What is the maximum overhead added to the rate analysis ? (in context of Nepal)

Subject Notes

Objective Box

PSC ADVERTISEMENT

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2024 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us