71) The ratio of the length of the drawing to the actual length of the objects is called

Discuss in Comment

representative fraction

72) Elements of cost estimate include

Discuss in Comment

all of the above

73) The method and unit of measurement for ashlars masonry in superstructure laid in cement mortar of 1:6 is

Discuss in Comment

cu.m.

74) When additional works are added to the original works the estimate is called

Discuss in Comment

supplementary estimate

75) The process of calculating amount of material labour and equipment for a unit of work together with overhead and profit for the contractor is

Discuss in Comment

rate analysis

76) Method of calculating quantity in which out to out and in to in lengths are considered regardless of the calculating through total centre line of the walls and useful of different thicknesses is called

Discuss in Comment

long wall and short wall method

77) An estimate is

Discuss in Comment

both of the above

78) The expenses of items which do not come under any regular heads of items and the cost of unforeseen items are

Discuss in Comment

contingencies

79) The role of consultant is to

Discuss in Comment

all of the above

80) PERT analysis is based on

Discuss in Comment

all of the above

Subject Notes

Objective Box

PSC ADVERTISEMENT

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2024 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us