Multiple Choice Question (4)

81) A construction schedule is prepared after collecting

Discuss in Comment

all of the above

82) The total set back from the centre line of the 11.0 m road of proposed guided land development or from the property line is

Discuss in Comment

7.5

83) The dispute in construction in resolved through discussion of all parties on their respective stands leading to the consensus. The process is called

Discuss in Comment

Amicable settlement

84) The valve which is placed between the municipal water and the domestic supply is

Discuss in Comment

ferrule value

85) (i) Working from whole to part ; (ii) Independent Check; (iii) Consistency of work are

Discuss in Comment

The bottom of the valley

86) While doing leveling in undulating terrain, it is preferable to set the level on

Discuss in Comment

One side of the slope

87) The simple horizontal angle between the true meridian and a survey line is known as

Discuss in Comment

Declination

88) Double pole-DP switch in electrical wiring is placed

Discuss in Comment

To stitch on/off both poles

89) A tank built to break the hydrostatic pressure in the water

Discuss in Comment

Break pressure camber

90) Alum is a

Discuss in Comment

Coagulant

Subject Notes

Objective Box

PSC ADVERTISEMENT

"Scientists dream about doing great things. Engineers do them."

Copyright © | 2021 - 2024 | Civil Boss For "MCQ" and Psc Notes. All rights Reserved

Follow us