to find actual cost per unit items to find economical use of materials both of the above nono of the above
Answer Discuss in Comment
gravity combination direct pumping artisan well
5cm 10cm 15cm 25cm
grid lines vertical line frame line graticules
M25 M20 M15 M10
The employer The consultants The contractor all of the above
causes less settlement has a depth of embedment less than its width is resting on the ground surface has low bearing capacity
are more plastic Bear high shear strength Are strong against landslide Are good for backfill
radiation resection traversing intersection
Venice Aluminum paint Linseed oil Red lead
"Scientists dream about doing great things. Engineers do them."
PSC Advertisement ⏩ | Federal PSC | Bagmati PSC | PSC Karnali | PSC Lumbini | PSC Sudurpaschim | PSC Gandaki | PSC State 1.