to find actual cost per unit items to find economical use of materials both of the above nono of the above
Answer Discuss in Comment
gravity combination direct pumping artisan well
5cm 15cm 25cm 10cm
grid lines vertical line frame line graticules
M15 M20 M10 M25
The employer The consultants The contractor all of the above
has low bearing capacity causes less settlement has a depth of embedment less than its width is resting on the ground surface
Are strong against landslide Are good for backfill are more plastic Bear high shear strength
traversing radiation resection intersection
Red lead Aluminum paint Linseed oil Venice
"Scientists dream about doing great things. Engineers do them."